These projects reflect our depth of capabilities. We specialize in complex, challenging
projects, regardless of size or dollar amount, and we are continually expanding our
resources to address new challenges and opportunities.
Proposed erection of one block of 5-storey residential apartment (Total 88 units) with 2 levels of basement carparks, swimming pool and roof terrace at 53 and 57 Oxley Road
Sewer Diversion Works at Robinson Road / Market Street
Temporary RC Holding Tank at T201 Mandai Depot
Replacement of WC flush valves inside Transit toilets at Level 1, 2 & 3 of Terminal 3, Singapore Changi Airport
Proposed sanitary works for the new workshop at 42A Sungei Kadut St 1
Construction of 2 Buildings, 1 steel shed, and ancillary works at Blk 309A @ Changi Naval Base
Construction of a 60 MGD water works and ancillary facilities at Lower Seletar
YTL Cement Silo, A 4-storey ancillary building office and other ancillary building on MK 6 at existing port cement terminal Pulau Damar Laut
Construction of 2 RC buildings, 1 steel shed & Ancillary works for Blk 309A & 309B Changi Naval Base
Construction of Metal Sheds, RC Office Buildings, Seaward Pontoon at Changi Naval Base
Construction of Single Storey Vehicle Storage at Transit Road
Construction of Xinsha Tuas South Boulevard site office
JECC2 - Live Connection for Commissioning for Manholes
T313 - Relocation of 4 nos of existing Fire Hydrant
C933 - Jalan Besar Station, Downtown Line Stage 3
C937 - River Valley Station, Downtown Line Stage 3
C935 - Sungei Road Station, Downtown Line Stage 3
Construction of RC Buildings, Renovation Buildings, and Ancillary Works at PLAB & TAB
Additional and alteration works at Gombak
Construction of Accom, Admin, Storage, and Common Facilities along Choa Chu Kang Way - Plumbing, Sanitary & Fire Hydrant System
T202 Construction of Woodlands North Station and Tunnels For Thomson-East Line
Proposed erection of a 2-storey detached dwelling house with attic at Swiss Club
Extension and renovation to the existing building and facilities in PLAB
C22A Changi Water Plant - Diversion of existing 300mm dia. Fire Hydrant, including blank-off and domestic water pipeworks
T302 Construction of Facility Building and Tunnels for Thomson-East Coast Line - Permanent diversion of Fire Hydrant and water pipe at Zone 14 and temporary diversion of Fire Hydrant at Zone 16
Contract T-08 Design and Construction of Sewer Tunnels for DTSS Phase 2 - Newater Pipe Laying Work
Construction of foundation, roads and services